CERT-In 6-Hour Reporting and 180-Day Log Retention with Sophos
Build a usable CERT-In runbook and log-source register, with noticing records, India-resident retention, NTP checks and clear managed-service boundaries.
Category: Cybersecurity · Published: 2026-11-26 · 10 min read · Author: ZM Technologies Team
CERT-In readiness depends on what your organisation can do when it notices a specified cyber incident, not merely on which firewall it owns. An Indian IT head needs an escalation route that works during an operational disruption and logs that can be retrieved later. A plant head needs to know who may isolate a production-sensitive system. A compliance owner needs a clear reporting decision, preserved facts and evidence of the retention design. This guide separates those responsibilities from Sophos product and managed-detection commitments.
The CERT-In Directions dated 28 Apr 2022 apply to service providers, intermediaries, data centres, body corporates and government organisations. They require specified cyber incidents to be reported within 6 hours of noticing, ICT logs to be retained for a rolling 180 days within India, and clocks synchronised to NTP using NIC/NPL or a traceable source. This is practical planning guidance, not legal advice. Confirm the incident categories and your organisation's obligations against the applicable Directions with your compliance adviser.
Distinguish noticing, investigation and reporting
A detection case can support your response, but it does not remove the organisation's reporting duty. Record when the organisation noticed the incident, who received the information and what was known at that point. Keep subsequent findings in the same timeline without overwriting earlier entries. Do not assume that the clock starts only after an external provider has finished investigating or management has held a meeting.
Assign an incident coordinator, a reporting decision owner and an alternate contact. Decide how staff, service providers and plant teams reach them. Separate the authority to isolate a system from the authority to communicate externally; the same person may hold both roles, but the decisions still need to be explicit. The Sophos compliance pillar places this workflow alongside ISO 27001, TISAX and DPDP preparation.
Build a reporting runbook people can use
The runbook should identify the applicable incident-category reference, the internal contacts, the reporting route and the evidence needed for a useful initial account. Avoid inventing a universal incident form or an additional statutory deadline in an implementation checklist. Use the official reporting process confirmed by your compliance owner, and keep the current instructions available to the people responsible for acting.
Record the affected systems, observed activity, noticing time, actions taken and unresolved questions. Distinguish confirmed facts from working hypotheses. Ask the legal or compliance owner how subsequent information should be handled through the applicable reporting process. Do not wait for a polished root-cause narrative before activating the reporting workflow. A rapid internal handover needs accurate available facts, not speculation presented as certainty.
| Response stage | Internal decision | Sophos contribution to evaluate | Evidence to preserve |
|---|---|---|---|
| Detection intake | Who receives and acknowledges the alert? | Sophos Endpoint, Firewall or MDR/XDR case | Original notification and the organisation's noticing record |
| Scope review | Which systems and business activities may be affected? | Available investigation records within the agreed service | Asset references, facts and open questions |
| Containment | Who can approve interruption of a sensitive workflow? | Product actions and MDR response within agreed authority | Approval, action time and observed outcome |
| Reporting | Who coordinates the applicable CERT-In process? | Technical evidence supporting the internal owner | Submission record and communication decisions |
| Follow-up | Who owns corrective work and further communication? | Investigation and reviewed configuration changes | Action register, evidence references and closure tests |
Confirm capabilities, integrations and response permissions during scoping. The table does not promise that every Sophos licence provides every action or that a managed service files regulatory reports for you. Those responsibilities belong in the agreement and your internal runbook.
Why MDR targets are not the reporting clock
Sophos MDR Essentials and MDR Complete both have a case-creation target of 2 minutes from detection and an initial response action target of 30 minutes. Keep these response targets distinct from regulatory reporting and recovery. MDR Complete adds full-scale incident response, with exact inclusions confirmed per quotation.
Both tiers include Microsoft 365 audit-log and Graph Security API integration at no extra cost. Confirm that the relevant integration is actually onboarded and that the internal team understands what the service receives. An available integration is not the same as complete visibility into your environment. Sophos Endpoint also integrates with Taegis MDR/XDR following the Secureworks acquisition in 2025 and the integration announcement in Sept 2025; confirm the chosen workflow rather than assuming parallel services share every case.
Separate retention duration, source coverage and location
Both MDR tiers include 90 days of data storage, with a 1-year add-on. A 90-day window is shorter than CERT-In's rolling 180-day ICT-log requirement. Even a longer service window does not prove the required logs are retained within India. The retained sources, their location and the retrieval process each need separate verification. Never describe a subscription duration as proof of India-resident storage without confirming the deployment and contract details.
Create a log-source register. Consider the firewalls, endpoints, servers, applications, identity systems and relevant cloud services in your actual scope. Reconcile the register with the required sources in your scope. For each source, identify the owner, collection path, storage destination, retention setting and retrieval method. Mark unavailable or unsupported sources openly and assign corrective work. A single accessible firewall export does not demonstrate coverage of the rest of the estate.
| Log-design question | What to confirm | Practical evidence |
|---|---|---|
| Which sources are covered? | Actual systems and collection paths in scope | Source register and a representative retrieved record |
| How long are copies retained? | Rolling 180-day design and deletion behaviour | Retention configuration and retrieval test |
| Where are retained copies stored? | Storage within India for the required ICT logs | Documented location and applicable deployment confirmation |
| Can the company retrieve them? | Access ownership and usable export path | Tested retrieval with context and timestamps |
| Can timelines be correlated? | NTP source and time handling across systems | Clock configuration and cross-source comparison |
| What happens if collection fails? | Detection of missing logs and action ownership | Collection-gap record and corrective action |
Test retrieval instead of trusting a setting
Select representative sources and ask the responsible person to retrieve records through the documented process. Check that the output identifies the source and preserves enough context to understand the event. Test the oldest available records appropriate to the system's actual operating history; a newly deployed archive cannot demonstrate history it never collected. Record any historical gap honestly and distinguish it from the new retention design.
Restrict access to sensitive logs and decide how exported copies will be protected. An incident export can contain information that should not circulate through an unrestricted shared folder. Keep a retrieval record describing who obtained the data, from where and for what purpose. Preserve original material appropriately and work from controlled copies when reviewing it. Keep the evidence-handling procedure documented and usable.
Synchronise clocks before you need a timeline
The Directions require clock synchronisation to NTP using NIC/NPL or a traceable source. Document the chosen source and the systems that use it. Check devices that cannot follow the standard configuration and record the exception and corrective approach. Do not assume a cloud console timestamp proves that all local devices are synchronised.
Compare representative records across the systems involved in a business workflow. Confirm how timestamps and time zones appear in exports so a reviewer can follow the sequence without guessing. If a system uses a different display convention, explain it in the evidence index. A timeline assembled during an incident is far easier to trust when the time configuration and export behaviour have already been checked.
Exercise the operational handover
- Confirm applicable incident categories and reporting instructions with the compliance owner. Make them accessible to the responsible contacts.
- Agree the noticing record and internal escalation route. Include an alternate contact and a way to act when the usual approver is unavailable.
- Define containment authority for business-sensitive systems. Have the plant or application owner approve the decision model before an incident.
- Verify the managed-service scope and product permissions. Separate investigation, technical response and regulatory communication responsibilities.
- Reconcile log sources, retention and India-resident storage. Test retrieval and document historical gaps without presenting them as covered.
- Review NTP configuration and compare timestamps across representative sources. Resolve unexplained differences.
- Run an illustrative incident exercise, preserve the decision timeline and correct failed handovers. Record the exercise findings and corrective actions.
Connect evidence to the other compliance programmes
The ISO 27001 technical-control guide can use the same operational records where the control objective and scope match. The DPDP safeguards checklist helps separate privacy breach decisions from the CERT-In process. Do not copy the 6-hour figure into another framework as if all reporting obligations were identical.
Automotive suppliers should also review ISA2027 transition preparation. For background, use understanding TISAX and TISAX/ISMS infrastructure preparation. Shared evidence is useful; shared assumptions about deadlines, assessment scope or legal authority are not.
Test the responder handover using MDR responsibilities, then check mobile incident sources for devices that your archive might otherwise miss.
What ZM does
For reporting and retention preparation, ZM Technologies scopes sources, archive requirements and responder handovers together. As a Sophos Silver Partner and Sophos MSP, we connect Firewall, Endpoint/XDR, MDR, Email with Phish Threat, Mobile and ZTNA in one Sophos Fusion (formerly Sophos Central) platform and console. ZM adds VAPT and ISO/IEC 27001:2022 Lead Auditor (GAQM) guidance so retrieval tests and corrective actions fit the wider programme. One partner provides fewer vendor handovers, one evidence trail for auditors and one escalation path.
Pune-based cloud-managed deployment and agreed remote 24x7 managed service support organisations across India, with site work scheduled as agreed. ZM prepares companies; it does not act as a CERT-In empanelled auditor or TISAX audit provider. Independent accredited bodies conduct the relevant external assessments. Account-based OEM pricing is handled through a quotation specifying source review, retrieval validation and the ongoing service scope.
Explore cybersecurity solutions, Sophos deployment services, Sophos partner overview, Firewall AMC and support, firewalls, endpoint protection, Firewall Selector to organise the project scope.
To check your log sources and reporting handover, Book a free compliance gap call.
FAQs
Does the 6-hour period begin after the MDR investigation?
The Directions specify reporting within 6 hours of noticing the specified incident. Do not assume an investigation postpones that point. Record the organisation's noticing time and activate the internal reporting process with the available facts.
Does Sophos MDR include enough retention by default?
Both tiers include 90 days of storage, while CERT-In requires a rolling 180 days of ICT logs within India. The 1-year add-on needs separate checks for source coverage and location. Design and verify the required archive rather than assuming it is included.
Is a firewall log export enough evidence?
Not by itself. Review the ICT-log sources in your actual scope, their retained copies, location, clock configuration and retrieval. A representative export is useful evidence for that source, not proof that every required system is covered.
Who should own the internal reporting runbook?
Name an incident coordinator and a reporting decision owner, with alternate contacts and business authority. Connect them with technical responders and test the handover before an incident.